MONROE, La., (KNOE 8 News) - Work continues on the installation of new water meters in Monroe. As of yesterday, almost 13,000 meters have now been replaced, with just over 10,000 meters to go.
The city is still using 2,000 meters a month as its installation goal.
In the next two weeks, the City's meter installation company, Vanguard Utility Service, Inc., is expected to be working in the following locations:
| 1ST ST |
DICK TAYLOR ST |
KING OAKS DR |
PIERCE DR |
| 2ND ST |
DISTRICT DR |
LEE AV |
PINE BAYOU CIR |
| 8TH ST |
DIXIE AV |
LIDELL ST |
PLUM ST |
| 9TH ST |
EAST ST |
LONG DR |
POLK ST |
| 10TH ST |
EGAN ST |
LOUISE ANNE AV |
PRICE ST |
| 11TH ST |
EVERS DR |
LUTHER DR |
RAILROAD AV |
| 12TH ST |
FILER ST |
LYNDON ST |
RAMBO ST |
| 13TH ST |
FOCH ST |
MALVERN ST |
RICHARDSON AV |
| 14TH ST |
FORREST ST |
MAPLEWOOD DR |
RICHMOND ST |
| 15TH ST |
GIROD ST |
MARBLE DR |
RICHWOOD DR |
| 18TH ST |
GOINS DR |
MARSHALL DR |
RIVER BARGE |
| 19TH ST |
GOLDMAN ST |
MARTIN L KING JR DR |
ROBERT DR |
| 20TH ST |
GORDON AV |
MAY DR |
ROBIN DR |
| ACCENT DR |
GRAND ST |
MAY ST |
ROBINSON DR |
| ALLEN AV |
GRAYLING LN |
MCARTHUR DR |
ROY DR |
| APPLE ST |
GROVES ST |
MCCALL ST |
RUFFIN DR |
| ARIZONA AV |
HADLEY ST |
MEMORIAL DR |
SHOTWELL ST |
| BAYLOR ST |
HAMPTON ST |
MILHAVEN RD |
SOUTH AV |
| BAYOU ST |
HAWES ST |
MILLIKEN ST |
SOUTHERN AV |
| BEN FRANKLIN DR |
HICKORY ST |
MOORE AV |
ST JOHN ST |
| BENJAMIN ST |
HIPPOLYTE AV |
MORRIS AV |
STACY DR |
| BENTON ST |
HOLLY ST |
MORRISON AV |
STANDIFER AV |
| BINSON CIR |
HWY 165 |
MOUTON AV |
STANDIFER ST |
| BUCKHORN BEND RD |
HWY 165 BY-PASS |
NICHOLS AV |
STATE FARM RD |
| BUNCH CIR |
IVY PL |
ORANGE ST |
STONE AV |
| CARLTON AV |
JACK MCENERY AV |
OUACHITA AV |
SUNNYSIDE DR |
| CAROLINA AV |
JACKSON ST |
OVER LEVEE HSE RD |
SUNSET DR |
| CARROLL DR |
JASON DR |
PARGOUD DR |
TERRY ST |
| CENTER ST |
JOHNSON CIR |
PARKVIEW DR |
TEXAS AV |
| COLUMBIA AV |
JOHNSTON AV |
PEACH ST |
THOMAS AV |
| CONRAD DR |
JONES DR |
PEAR ST |
US HWY 165 |
| CORETTA DR |
KEEBLE DR |
PEARL ST |
WILKINS ST |
| CRESCENT DR |
KENNEDY DR |
PERSHING AV |
WILTON DR |
| DAVIS DR |
KING CIR |
PETAIN ST |
WINNSBORO RD |
Residents will receive notice when Vanguard is going to be in their area to upgrade their meter. All Vanguard employees will be dressed in uniform and have a photo ID. Each vehicle will also be marked with the Vanguard logo, for ease of identification.
Vanguard will leave a door hanger indicating that residents' meters have been swapped or was inaccessible. If the notice indicates the meter was inaccessible, residents should call the contact number on the notice to make an appointment to upgrade their meter as soon as possible.
Meters may be inaccessible due to but not limited to one of the following reasons:
· Dog
· Locked gate
· Meter is blocked by vehicles or other objects
· Obstructed view
· Shrubs and plants need to be trimmed
· Unsafe for meter installers to access
Residents should avoid blocking the access to their water meter as this will delay their meter upgrade.
The meter change out takes approximately 30 minutes for each customer. Water usage will cease during the 30 minute installation period.
For meter installation concerns, please contact Vanguard's Project Manager Tony Howell at (318) 807-5423 or thowell@vusinc.com.